MARS Builders provide Building, Groundwork and Demolition Services throughout Hertfordshire (Herts), Welwyn, Stevenage, St Albans, Harpenden, Knebworth, Hertford, Hatfield, Welwyn Garden City, Potters Bar, Brookmans Park and surrounding areas
Builders Services include:
Building
New build projects
House builders
Domestic Extensions
Conversions
Building Works
Internal alterations
Loft conversions
Design and Build
Architects services
Drawings for planning permission
Drawings for building regulations
Design and consultation
Structural Engineers
Foundation design
Structural Design
Demolition and Groundworks
4 and 8 Wheel Grab Lorries
Domestic and commercial demolition
Site clearance
Strip out
Internal demolition
All excavation works
Plant hire
Mini digger hire with driver
JCB hire with driver
1.5 ton - 20 ton excavator hire with driver
Skip loader hire
Dumper Hire
Micro-piling
Piled rafts
Micro-Piles and ground beams
Block and beam floors
Welwyn Services - Micro-piling
Micro-piling is become a much more common groundwork solution when foundation depths exceed 2-2.5m.
Cost effective, practical and better for the environment
A much more cost effective and practical solution is to form a piled raft or piles with ground beams. With much less excavation or concrete required and less harm to the environment micro-piling is the best solution. Traditionally deep strip foundations require excessive excavation, there is strong risk of trench collapse and excessive use of materials.
We are able to offer a complete service from site clearance, foundation design by structural engineer to local authority requirements, piled foundations, with reinforced concrete raft or ground beams and if required we are able to take the works to damop proof course level including block and beam floor.